The full scaffold shall not exceed several meters

Time:2022-07-29 11:06:16View count:



What are the requirements for the erection specifications of full scaffold




1. The height of the full scaffold shall not exceed 36 meters, and the construction layer shall not exceed 1 layer.




2. The vertical pole joint shall be connected with fasteners, and the length of the horizontal pole shall not be less than 3 spans.




3. Set scissors every 6 to 8 meters from the bottom to the top around and inside the frame.




4. When the erection height is less than 8 meters, horizontal diagonal braces are set at the top of the frame. When the height is more than 8 meters, horizontal diagonal braces are set at the bottom of the frame and the vertical spacing can not exceed 8m meters, and the width of the diagonal braces is 6 to 8 meters.




5. The height and width shall not be greater than 3. When the height and width are greater than 2, wall connecting parts shall be set around the outside and inside with a horizontal interval of 6 to 9 meters and a vertical interval of 4 to 6 meters to tie with the building structure.




What should be paid attention to in the construction of scaffold




1. Before erecting the scaffold, first check the decoration drawings, then measure the approximate consumption of each room, and then prepare the materials for the third floor to meet the needs of the project.




2. When erecting a scaffold, the thickness of the pole is usually 5mm, and there will be a plug at both ends of the tie rod. When connecting, just knock the plug into the hole in the flower plate, which is very convenient.




3. When the backfill is compacted, a 5cm thick wooden scaffold board needs to be paved on the surface, and a layer of steel base should be paved on the scaffold board, and a vertical pole should be placed. Note that the wooden scaffold should be stable, and there should be no suspension.




4. In scaffolds, cross bars and upright rods of different sizes are used as accessories for transferring loads, while shear braces and diagonal braces are used to ensure the rigidity and stability of scaffolds, so special attention should be paid.




In short: what are the requirements of the full hall scaffold erection specification and what should be paid attention to in daily use of scaffold? Let's introduce it here first. Do you understand it. The erection of full scaffold is based on requirements, so as to reduce the existence of danger and ensure the safe use in the later stage.