必发365

Service Hotline:0335-7168696
News
News
News

Common problems of formwork support system

Time:2022-08-03 09:07:49View count:



The common problems in the use of formwork support system can also be said to be safety problems, quality problems and management problems.


The so-called safety problem means that in the design stage, the impact on project quality, cost and safety is the most significant. Formwork engineering is a typical measure project, which is obviously temporary, so it is difficult to get the attention of the construction unit in the work, which is also the main problem of the current construction not in accordance with the specifications. In the process of preparing the formwork construction scheme, the construction unit often makes great differences from the on-site construction situation because it makes excessive reference to other work items and even directly applies the successful cases of other projects. Poor value of design load and difference in combination calculation will have a negative impact on the development of the project. In the process of concrete pouring, if the value of dynamic load is too small, it will inevitably cause the safety problem of the design system.


Construction management issues. Among many accident inducing factors, poor management effect will also affect the safety of the template system. The main problems are: the construction unit did not prepare the formwork scheme according to the specification requirements in the project construction, resulting in the disqualification of the prepared scheme, which seriously affected the principle of the scheme.


Finally, let's look at the quality problem. The formwork support system is an important link that cannot be ignored in the current construction engineering. The qualification and quality problems of construction enterprises should be investigated in the premise of project supervision to ensure that each stage of the project can meet the work needs. However, some construction enterprises, affected by short-term economic interests, have not paid attention to the project supervision system, and even believe that the implementation of the system will cause a waste of construction costs. For example, in the process of acceptance of the project, the rigidity and material model of the tall formwork have not been effectively accepted, which also makes the formwork construction materials shoddy. Therefore, during the construction of the high formwork support system, the supervision work cannot attract the necessary attention. This situation will inevitably have a negative impact on the construction site, and even have a serious impact on the quality of construction projects. For another example, due to the development of the concrete pouring of the wave board, it is necessary to pay effective attention to the pouring direction, but in the actual project construction, many workers ignore the construction requirements in order to save time and reduce the workload, do not pay attention to the building direction and pouring skills, and blindly rely on brute force and experience to carry out the work, which is not only difficult to achieve the effective guarantee of the concrete quality, Serious will also have a negative impact on the project quality.



必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
网站地图网站地图
友情链接:尊龙凯时  海洋之神  老哥俱乐部  ca88  bifa必发  bti体育  大发welcome  w66  云顶集团  云顶集团  米乐M6  w66