必发365

Service Hotline:0335-7168696
News
News
News

Advantages of using aluminum die

Time:2022-10-24 10:31:48View count:



Short construction period


The aluminum alloy building formwork system is a quick form removal system. The wall column formwork can be removed 24 hours after the concrete is poured, the beam side formwork can be removed 36 hours later, the beam bottom and slab bottom formwork (non bearing) can be removed 48 hours later, the bearing column at the slab bottom can be removed 12 days later, the bearing column at the beam bottom can be removed 14 days later, and the cantilever column can be removed 28 days later. The normal construction of a set of aluminum alloy formwork can reach one floor in four or five days, greatly saving the management cost of the contractor.


More repetitions, lower cost


The aluminum alloy building formwork system uses aluminum alloy profiles formed by overall extrusion as raw materials to process aluminum alloy formworks of various sizes and specifications required by the project. A set of aluminum alloy formworks has been recycled for many times in standard construction, and the average use cost is low.


Convenient and efficient construction


The aluminum alloy building formwork system is simple and convenient to assemble. It is completely assembled manually without the assistance of any mechanical equipment (workers usually only need a small hook and hammer for construction, which is convenient and fast). Skilled installation workers can install 20-30 square meters per person every day.


Good stability and high bearing capacity


All parts of the aluminum alloy building formwork system are assembled with aluminum alloy formwork. After the system is assembled, it forms an integral framework with good stability; The bearing column shall be arranged reasonably, and the bearing capacity can reach 30KN per square meter.


Wide application range, high recovery value


Aluminum alloy building formwork is applicable to walls, columns, beams, horizontal floors, stairs, windowsills, floating bedplates, etc; After the aluminum alloy construction formwork is scrapped, when the residual value of waste disposal is high, the advantages of sharing cost are obvious. The concrete surface effect is good. After the aluminum alloy building formwork is poured with concrete, the concrete surface quality after the formwork is removed is flat and smooth, which can basically meet the requirements of finishing and fair faced concrete. There is no need for plastering, which can save plastering costs.


Simple on-site management


All accessories of aluminum alloy building formwork system can be reused. After the construction, installation and removal of aluminum alloy formwork are completed, the site is free of any garbage and the construction environment is safe, clean and tidy.


Strong standards and versatility


Aluminum alloy building formwork has many dimensions and specifications, which can be assembled with different specifications according to the project. When the used formwork is applied to a new building project, only about 20% of the non-standard size and specifications of the formwork need to be replaced, effectively reducing costs.


Low carbon emission reduction


All materials of aluminum alloy building formwork system are renewable materials, which comply with the national regulations on energy conservation, environmental protection, low carbon and emission reduction of construction projects. Many developed countries have stipulated that wood formwork is not allowed to be used in construction projects.



必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
网站地图网站地图
友情链接:尊龙凯时  尊龙凯时  c7c7娱乐  BG大游  BG大游  亚美AM8AG  安鑫娱乐  918博天堂  918博天堂  GA黄金甲  k8凯发  不朽情缘