必发365

Service Hotline:0335-7168696
News
News
News

Aluminum alloy formwork

Time:2023-03-01 08:30:18View count:



Builders began to pay attention to aluminum alloy formwork, which is the inevitable result of the development of the formwork support industry to a certain extent and the result of various factors.


Wooden plywood and wooden square back ridge depend on the on-site display of the technical level, mentality and management level of the on-site construction personnel. Many problems are randomly handled by the construction site. There are a lot of uncontrollable factors in the project quality and construction efficiency in this mode. In the wall formwork, top formwork and support system of the traditional construction method, even if some good products and processes are adopted locally, and the system integration is lacking, the overall efficiency is difficult to fully play out. The all-steel formwork system widely used in the northern region has partially solved the disadvantages of the wall formwork support construction method, but the design characteristics of this type of formwork determine that it can only be applied to the wall formwork and can not solve the problem of effective cooperation with the top formwork and support system, which also determines that this type of formwork can not achieve the one-time pouring of the wall panel and roof, so that the advantages of rapid pouring of the wall formwork cannot be fully played in the entire construction process.


At present, it is widely used in the support system of the floor, mostly steel pipe fasteners and bowl-buckle scaffold. These systems and floor formwork systems are independent and lack of integrated design. There are many phenomena such as low construction efficiency, waste of materials and man-hours. Safety accidents often occur due to improper supporting equipment and construction schemes, and even cause serious casualties. At present, the internationally popular early dismantling system is also difficult to be effectively applied and implemented in such support schemes.


With the rapid increase of labor costs in China, the construction method that relies on human naval warfare and adopts low efficiency and low cost formwork system is no longer suitable for the current requirements. Based on the current wage level, China's construction budget costs, including equipment and man-hour costs, have approached or even exceeded those of countries and regions with wage levels like Germany. The reason is that the traditional and inefficient wooden formwork and extensive construction methods are still widely used in our construction. It not only wastes a lot of forest resources such as timber, violates the national industrial policy and increases carbon emissions, but also causes a significant increase in construction costs.


The key to solve these problems is to adopt efficient, modular and reusable new formwork and support system, as well as corresponding new construction methods that can effectively save man-hour costs on the construction site. The aluminum alloy formwork technology, which conforms to the market demand and solves the problems existing in the above construction, was first born and widely used in developed countries.



必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
网站地图网站地图
友情链接:亚美AM8AG  pg电子  尊龙凯时  bifa必发  w66  918博天堂  pg电子  尊龙凯时  老哥俱乐部  海博论坛  全网担保网  海博论坛