Leasing of new steel back ridge
Steel back ribs are indispensable building materials in infrastructure construction. When building a residence, it is necessary to do preparatory work, first of all, it is necessary to do foundation engineering, such as digging the foundation, digging soil, or doing a good job in drainage engineering. On the construction site, the treatment of bricks, the waterproof layer for the basement, the pouring of the bottom plate, and the maintenance of concrete all require time and workers to complete.
For the main structure, this part mainly involves pouring concrete and erecting the entire frame first. Concrete pouring is a relatively important link. Preparations before concrete pouring: based on the characteristics of building construction, formulate a general pouring plan, find the pouring starting point, and construction sequenceAccording to the different requirements of the base layer, it shall be cleaned to avoid the existence of a large amount of water accumulation; Check the quantity of reinforcement, formwork, support, and embedded parts to see if they meet the standards.
What should be paid attention to during pouring: Before pouring concrete, it should be handled in combination with external conditions. The concrete required varies depending on the placement location; Before starting construction, it is also necessary to check whether there are any problems with the opening evaluation of the concrete, and pay attention to whether the grade meets the standards, and the designed slump can meet the requirements of on-site construction; During the initial construction process, it is necessary to consider the construction of joint parts, especially when pouring wall column concrete, and it is necessary to use original mortar joints to avoid pitted surfaces or rotten feet, so as to ensure that the quality of the poured wall column can meet the standard; Throughout the project, professional personnel are required to supervise the work, in order to promptly identify and address deficiencies. If there is formwork expansion or formwork movement, the construction cannot be continued, and reinforcement work needs to be carried out. After the treatment is completed, the construction can be continued.
The new type of steel back ridge is a product developed according to the market usage, which can solve the problems generated during the construction process and is recognized by the construction unit. Shengchuan Building Materials is not only a manufacturer of steel back ribs, but also has its own research and development team, which can solve the problems encountered by the construction unit in a timely manner. Some leasing companies do not have research and development, and are lagging behind in terms of leased steel backlogs, which do not solve the problem in a timely manner.
When selecting a steel backing supplier, it is important to take into account the company's strength, that is, from the personnel and freight yard ("Where can I rent steel backing" is described in the article /xinwenzixun/473.html )Three aspects of investigation, and then make a choice.