必发365

Service Hotline:0335-7168696
News
News
News

How does the new type of shear wall steel support replace the traditional round pipe timber and impr

Time:2021-11-26 08:40:47View count:

In the process of building formwork reinforcement construction, the traditional formwork reinforcement support system is highly dependent on the technical level of workers. Due to technical differences, sometimes the joints are not tight, there are formwork explosion and formwork expansion, on-site stop, replacement and re reinforcement. Those uncontrollable factors easily lead to construction quality, power and safety problems, and standardized construction is difficult to be effectively controlled.

With the development of the construction industry, the building materials supply industry is also developing. Among many building materials enterprises, the new shear wall steel support and reinforcement system has become the leader in the building materials industry. Qinhuangdao Shengchuan construction

The new shear wall steel structure formwork reinforcement system has the main keel retractable and infinite extension, which can adapt to most building construction environments. At the same time, it is a complete steel structure product, which can be recycled for 300 ~ 500 times. The frame structure is stable and does not deform, which ensures the construction safety. The design concept of small parts can be combined freely through the connection of connecting tools. It is convenient for workers to carry and keep during construction, and is particularly practical for the narrow construction on the construction site.

The new shear wall steel support reinforcement system replaces wood with steel, responds to the call of national environmental protection and resource conservation, and protects the long-term development of forest resources. The new shear wall steel support reinforcement system reflects the design and customization concept of new green building materials from material selection, technical treatment, installation mode and structural principle. It has high strength, stable structure, first-class quality after mold, and no honeycomb, pitted surface, crack, hollowing and other phenomena. After concrete pouring, the effect of dust exemption can be achieved without secondary rework. It virtually reduces construction waste and realizes the real concept of environmental protection.



必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
网站地图网站地图
友情链接:尊龙凯时  全网担保网  新利体育luck18  k8凯发  918博天堂  大奖国际  威斯尼斯wns888入口  云顶集团  尊龙凯时  pg电子  银娱  918博天堂