Construction management of formwork support system
The support system with mature technology should be selected preferentially; Operators shall work with certificates after training; Technical disclosure before erection and signing procedures; Operate in strict accordance with regulations and disclosure requirements;
Erection management:
a: The bearing capacity and settlement of the foundation shall meet the requirements of the scheme design
b: When the height-width ratio is greater than 2, structural measures shall be added
c: Lapping is strictly prohibited, and the bottom broom, support and bridging are set
d: Set up climbing measures for operators
e: The formwork support system shall be independent
Use check:
a: The construction load shall be uniformly stacked, leveled and stable
b: The bottom of the column shall not be loose and suspended, and any rod fastener shall not be removed arbitrarily
c: Check carefully during construction
Concrete pouring:
a: Sign the pouring order after the conditions for safe production are met
b: Ensure that the support system is uniformly stressed to avoid instability and inclination
c: Special personnel shall be assigned to observe the construction process
Demolition management:
a: Dismantle after pouring concrete reaches the strength of formwork removal
b: Strictly control the removal sequence - from top to bottom, and it is forbidden to remove the upper and lower layers at the same time
c: Special personnel shall be sent to the ground and uniformly stacked according to specifications
d: Fence and warning signs shall be set