必发365

Service Hotline:0335-7168696
News
News
News

Scaffolding

Time:2023-02-21 13:56:41View count:

Speaking of scaffolding, people in the construction industry know something about it. For some specific scaffolding knowledge, the following is a detailed introduction. The difference between formwork support system and scaffold; Full scaffold shall not exceed several meters; Advantages and disadvantages of bowl-buckle scaffold and disk-buckle scaffold; Precautions for scaffold leasing, etc.

The support system of coiled scaffold is divided into upright pole, cross pole, diagonal pole, adjustable base, adjustable bracket and zigzag. The formwork support system consists of panels, supports, supports and connectors. The difference between the two can be seen from the composition.

The height of full scaffold shall not exceed 36 meters, and the construction layer shall not exceed 1 layer. The vertical pole joint shall be connected with fasteners, and the length of horizontal pole shall not be less than 3 spans. Cross bracing shall be set from the bottom to the top every 6 to 8 meters around the outside of the frame and inside the frame. When the erection height is less than 8 meters, horizontal cross bracing shall be set at the top of the frame. When the height is more than 8 meters, horizontal cross bracing shall be set at the bottom of the frame and the vertical spacing shall not exceed 8 meters. The width of cross bracing shall be 6 to 8 meters. The height and width shall not be greater than 3. When the height and width are greater than 2, the wall connecting parts and the building structure shall be set at a horizontal interval of 6 to 9 meters and a vertical interval of 4 to 6 meters around the outside and inside.

The turnbuckle scaffold is composed of upright pole connecting plate, buckle connector pin, horizontal pole end buckle connector, horizontal pole, diagonal pole, diagonal pole end buckle connector, and upright pole. During the construction process, the construction shall be carried out in strict accordance with the construction specifications of the turnbuckle scaffold. It is strictly forbidden to use it in excess of the load, and the construction personnel shall also take safety measures according to the regulations, and it is not allowed to chase on the construction platform; Construction is not allowed in strong winds, thunderstorms and other weather. The dismantling of the turnbuckle scaffold shall be planned in a unified way, and the dismantling shall be carried out in the reverse order to the erection. During the dismantling, it shall also be handled with care, and direct throwing is strictly prohibited. The disassembled parts should also be stacked neatly. The coiled scaffold shall be stored separately according to different parts, which shall be stacked neatly and placed in a dry and well-ventilated place. In addition, the storage place should be the place with corrosive objects.

In short, only a detailed understanding of the knowledge of the construction industry is helpful for the research and development of scaffolding production enterprises and product upgrading. For scaffolding sales and leasing enterprises, it is conducive to communication with customers and facilitate transactions.



必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
网站地图网站地图
友情链接:尊龙凯时  pg电子  环亚集团  918博天堂  尊龙凯时  尊龙凯时  尊龙凯时  pg电子  凯时娱乐  pg电子  南宫娱乐  大奖国际