Formwork support construction scheme
The plan refers to a plan that is specific, thorough and highly operational in terms of purpose, requirements, methods, methods, progress, etc.
The construction scheme is different because of different projects, different requirements and different materials,
The project construction plan is generally composed of five parts: project overview, technical measures for formwork support, technical measures for formwork removal, and measures for safe construction of formwork works.
In building construction, the reinforcement of formwork support is also indispensable, and now the steel back ridge is generally used. When selecting steel back ridge, the following items should be noted.
1. The fixed support is adopted, the component is highly standardized, and the formwork removal quality is good.
2. Convenient construction and low operation difficulty of workers are conducive to the improvement of work efficiency and duration.
3. Replacing wood with steel can save wood, and it can be reused for many times.
4. The operation is convenient and reliable, the construction is simple and safe, and the management is convenient.
5. It has a significant effect on the forming quality of concrete members of internal and external corners and short-leg shear walls.
6. It has both specificity and versatility to avoid random operation by workers.
7. Reduce the labor intensity of workers, save labor and save costs.
Scope of application of steel back ridge:
It is applicable to various shear walls, frame-shear wall structures, frame structures, wall-connected columns, large underground parking lots, etc.