必发365

Service Hotline:0335-7168696
News
News
News

Formwork support construction scheme

Time:2023-02-24 08:55:52View count:

The plan refers to a plan that is specific, thorough and highly operational in terms of purpose, requirements, methods, methods, progress, etc.

The construction scheme is different because of different projects, different requirements and different materials,

The project construction plan is generally composed of five parts: project overview, technical measures for formwork support, technical measures for formwork removal, and measures for safe construction of formwork works.

In building construction, the reinforcement of formwork support is also indispensable, and now the steel back ridge is generally used. When selecting steel back ridge, the following items should be noted.

1. The fixed support is adopted, the component is highly standardized, and the formwork removal quality is good.

2. Convenient construction and low operation difficulty of workers are conducive to the improvement of work efficiency and duration.

3. Replacing wood with steel can save wood, and it can be reused for many times.

4. The operation is convenient and reliable, the construction is simple and safe, and the management is convenient.

5. It has a significant effect on the forming quality of concrete members of internal and external corners and short-leg shear walls.

6. It has both specificity and versatility to avoid random operation by workers.

7. Reduce the labor intensity of workers, save labor and save costs.

Scope of application of steel back ridge:

It is applicable to various shear walls, frame-shear wall structures, frame structures, wall-connected columns, large underground parking lots, etc.



必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
网站地图网站地图
友情链接:壹定发  尊龙凯时  ag亚娱  bifa必发  k8凯发  兴发娱乐  尊龙凯时  pg电子  尊龙凯时  918博天堂  米乐M6  尊龙凯时